How do I make a construction schedule?

Author

Andrew Mclaughlin

Published Mar 19, 2026

If you follow these five steps, you’ll hit all the major points that need addressing when creating a construction schedule.

  1. Get Info and Tools.
  2. Collect and Prioritize Tasks.
  3. Add Duration.
  4. Allocate and Execute.
  5. Review, Review, Review.
  6. Gantt Charts for Plans and Schedules.
  7. Resource and Team Management.

Do you need a general contractor to remodel a house?

Every major renovation project requires a general contractor to handle the actual construction work done. Some renovations, however, need a trained architect for technical and design services.

What are the 13 milestones of construction?

Milestones might include, for example:

  • Securing funding.
  • Acquiring a site.
  • Appointing consultants.
  • Completing design stages.
  • Client approvals.
  • Securing permissions.
  • Tendering the construction contract.
  • Appointing a contractor.

What is a construction project schedule?

In construction management, a construction project’s schedule outlines each step that should be completed by a specific date before the next step can be taken. A successful schedule ensures that project steps are completed in a timely manner and in a way that minimizes delay.

What is a schedule A of a construction contract?

Construction projects can be a tornado of documents: contracts, plans, invoices, notices, pay apps, waivers, change orders, and more. At its most simple, a schedule of values is a start-to-finish list of work items on a project that represent the entire project from beginning to end and the entire contract price.

What is construction Milestones?

Construction Milestones means the dates identified in a Project Schedule by which the Contractor must complete certain critical activities in construction of a Project.

What do you call a construction schedule?

It could be depicted as a bar chart schedule or a CPM schedule. A construction schedule is analogous to a contractor’s bid. Just as a contractor’s bid is an estimate of its cost that it expects to spend to build the project, the schedule represents an estimate of the time required to construct the project.

What comes after foundation in construction?

2 FRAMING: After the foundation is poured and set, the form boards are removed and framing of the house begins. Just as our skeleton serves as the structure for our bodies, the frame of a house is the underlying structure of the home.

What is a contractor schedule?

This is a critical path method (CPM) logic diagram used by the contractor, not only to plan the works, but also to record actual progress and to show how the remaining works will be completed. …

Whats the difference between construction and remodeling?

Remember construction involving renovation often refers to “restoring” or “repairing” an existing structure, replacing the old with the new. Remodel means “to change the structure or form of something.” If you’re looking to remodel your bathroom, you’re looking to change the appearance of it.